1. RevMetrix > 
  2. 2024 Capstone > 
  3. How To Contribute > 
  4. GitHub Workflows

GitHub Workflows

Table of Contents

  • GitHub Workflow - Backend

    How to create a branch of the cloud-infrastructure repository and make edits

  • GitHub Workflow - Frontend

    How to create a branch of the frontend repository and make edits

  • GitHub Workflow - Simulation

    How to create a branch of the simulation repository Test branch and make edits

RevMetrix Logo

  • 2024 Capstone
    • Current State of RevMetrix
      • 2024 Fall Backend
      • 2024 Fall Ballspinner
      • 2024 Fall Frontend
      • 2024 Fall Simulation
      • 2024 Spring Backend
        • Database Observation Data
      • 2024 Spring Frontend
      • 2024 Spring Simulation
    • How To Contribute
      • Continuous Integration/Deployment
      • Contributing Documentation
      • DigitalOcean Management
        • Creating a Droplet
        • Managing a Droplet
      • Dockerizing an Application
      • Getting Started
      • Getting Started
        • Backend
        • Ciclopes
        • Mobile Application
        • SmartDot Simulator
        • Visualizer
      • GitHub Workflows
        • GitHub Workflow - Backend
        • GitHub Workflow - Frontend
        • GitHub Workflow - Simulation
      • Linking Domains
      • RevMetrix WebAPI
        • Adding & Managing Endpoints
        • Security
        • Web API Client
  • Initial Project Ideas
    • Backend - Database Architecture
    • Phone App - Proof of Concept
    • Simulation - First Thoughts
  • Project Assignments
    • Fall 2023
      • Analysis and Design
        • Backend Team
        • Frontend Team
        • Simulation Team
      • Project Requirements
        • Backend Requirements
        • Frontend Requirements
        • Simulation Requirements
    • Fall 2024
      • Analysis and Design
        • Backend
        • Ball Spinner Controller
        • Ball Spinner Protocal
        • BallSpinner
        • DataBase Schema
        • Frontend
      • Proposal
        • Architecture
        • Current System
        • Design Approach
        • Future Implementations
      • Requirements
        • 50% Working System
        • Abstract
        • Final Working System
        • General Project Requirements
        • General Project Requirements
        • Minimum Working System
    • Spring 2024
      • Detailed Proposal and Design
  • Project Milestones
    • Fall 2023
      • MS1 - Minimal Working System
      • MS2 - 50% Working System
      • MS3 - Final Working System
    • Fall 2024
      • MS1 - Minimal Working System
      • MS2 - 50% Working System
      • MS3 - Final System
    • Spring 2024
      • Milestone 1
      • Milestone 2
      • Milestone 3
  • SmartDot
    • ISmartDot Interface
    • SmartDot Hardware
    • SmartDot Simulator
  • Technologies Used
More
  • CS400 RevMetrix Home Page
  • CS402 RevMetrix Home Page
  • GitHub Organization
  • Google Drive
  • Credits

  •  
  •  
  •  

2023 @ RevMetrix